Counterweights, Stacker_____________________Burner display_____________________Electric Stacker_____________________Nsvzkary_____________________UPS boards

Report Launch,fa

Condition,,fa,Program,,fa,done,,fa,Filter history,,fa,Reporting,,fa,Task Name,,en,Lubrication,,en,Free run,,en,Test 1h Local,,en,Mech check list,,en,Elec check list,,en,Inst check list,,en,Test 72h CCR,,en,Problem,,en,Total,,fa,Equipment No,,en,Equipment Name,,en,Builder,,fa,Number,,fa,unit weight,,fa,total weight,,fa,Basic Equiment,,en,BI01-03BI04,,yo,Concentrate Bins,,en,Azaran site,,ku,MX01,,mt,MX02,,mt,Mixers,,en,Loedige Co,,en,BI05-03BI08,,yo,Bentonite Bins,,en,AR01-03AR04,,eu,Aeration Systems,,en,Hasler,,en,EH01,,mi,Electrical Heater for NaOH Tank,,en,Electro-thermal plan,,fa,PS01-04PS08,,ht,Plough Scrapers,,en:
from:
till date of:
To set up equipment to clear the Pilot,,fa,Cold Commissioning,,en,The number was,,fa,Plant Air and Instrument Air System,,en,Pre commissioning check list,,en,۹۶/۰۱/۲۹,,en,۹۶/۰۲/۰۹,,en,۹۶/۰۲/۲۹,,en,۹۶/۰۱/۲۷,,en,۹۶/۰۱/۳۱,,en,۹۶/۰۳/۰۵,,en,۹۶/۰۳/۰۹,,en,۹۶/۰۳/۱۱,,en,in history,,fa,Concentrated between charged,,fa,۹۶/۰۲/۰۲,,en,۹۶/۰۵/۱۸,,en
Task Name Free run Test 1h Local Cold Commissioning
تعداد کل 178 178 178
تعداد انجام شده 178 178 178
Area Free run Test 1h Local Cold Commissioning
تعداد کل تعداد انجام شده تعداد کل تعداد انجام شده تعداد کل تعداد انجام شده
05Indurating 94 94 94 94 94 94
06Process Gas System 47 47 47 47 47 47
07Pellet Screening 12 12 12 12 12 12
08Hearth Layer Handling 4 4 4 4 4 4
15Cooling Water System 13 13 13 13 13 13
16Plant Air and Instrument Air System 8 8 8 8 8 8

Row Area Equipment No. Equipment Name تعداد وزن کل Free run Test 1h Local Mech check list Elec check list Inst check list Pre commissioning check list Cold Commissioning Problem
121 06Process Gas System 06DA20 Damper 1 5662
۹۶/۰۵/۰۳

۹۶/۰۵/۱۵

۹۶/۰۵/۲۰
122 06Process Gas System 06DA31 Damper 1 2500
123 06Process Gas System 06DA32 Damper 1 3500
124 06Process Gas System 06DA33 Damper 1 2500
125 06Process Gas System 06DA34 Damper 1 3000
126 06Process Gas System 06DA21,22 Damper 2 8564
۹۶/۰۵/۰۳

۹۶/۰۵/۱۵

۹۶/۰۵/۲۰
127 06Process Gas System 06AG01 Agitator 1 159
128 06Process Gas System 06PU01, 06PU02 Slurry Pumps 2 1002
129 06Process Gas System 06DP01, 06DP02 Double Pendulum Flap for Sealing Wind Box I, II (06WB01,02) 2 700
۹۶/۰۴/۱۳
130 06Process Gas System 06DP06 ,06DP07 Double Pendulum Flap 2 580
131 06Process Gas System 06DP08,06DP09 Double Pendulum Flap 2 580
132 06Process Gas System 06DP10,06DP11 Double Pendulum Flap 2 580
133 07Pellet Screening 07CV01 Belt Conveyor 1 30000
۹۶/۰۳/۱۱

۹۶/۰۳/۱۱

۹۶/۰۳/۲۳
134 07Pellet Screening 07CV02 Belt Conveyor 1 29000
۹۶/۰۳/۱۱

۹۶/۰۳/۱۱

۹۶/۰۳/۲۳
135 07Pellet Screening 07BS01, 07BS02 Belt Scales 2 142
۹۶/۰۳/۱۷

۹۶/۰۳/۱۷
136 07Pellet Screening 07DV01, 07DV02 Diverter Chute 2 7264
137 07Pellet Screening 07SC01/02 Product Screens 2 34000
۹۶/۰۳/۱۳

۹۶/۰۳/۱۳

۹۶/۰۳/۱۳
138 07Pellet Screening 07CV03 Belt Conveyor 1 12000
۹۶/۰۳/۱۱

۹۶/۰۳/۱۱

۹۶/۰۳/۲۳
139 07Pellet Screening 07BS03 Belt Scale 1 71
۹۶/۰۳/۱۷

۹۶/۰۳/۱۷
140 07Pellet Screening 07CV04 Belt Conveyor 1 6000
۹۶/۰۳/۰۳

۹۶/۰۳/۰۳

۹۶/۰۳/۲۳