Counterweights, Stacker_____________________Burner display_____________________Electric Stacker_____________________Nsvzkary_____________________UPS boards

News category: ‘Civil’

Align the top of the disk mounting structure

Since the beginning of March 94, installation disc in the top level structure Green construction began.

The beginning of the Civil conveyor CV04

The date 94/07/19 by sending drawings to the job site excavation foundation conveyor CV04 hall began mixing the raw pellets.

Main concrete of Indurating Building part 2

Part 2 of Indurating Building has been started with 85 cubic meter on 2014/04/29.

Start of construction part 2 Indurating foundation.

Reinforcement Part 2 from 2014/04/19 and formworking begin was date 2014/04/25..

Main concrete of Indurating Building part 3

Part 3 of Indurating Building has been started with 200 cubic meter on 10/04/2014.

you can see the latest pictures by clicking here.

Structure of Mixing Building

Installation of Mixing Building structure has been started on 08/04/2014.

Part 3 of Indurating Building

Lean Concrete of Part 3 with 24 cubic meters done on 13/03/2014.

Start carrying structure of Mixing Building to the Site

Hall of incorporation of carrier structure on the site was started on 05/12/1392.

Concreting Axis 130 and 140 of Indurating Building

accomplishment of concreting the Axis 130 and 140 foundations; using up to 180 cubic meter concrete, on 23/1/2014 ..