News category: ‘Civil’
Align the top of the disk mounting structure
Since the beginning of March 94, installation disc in the top level structure Green construction began.
The beginning of the Civil conveyor CV04
The date 94/07/19 by sending drawings to the job site excavation foundation conveyor CV04 hall began mixing the raw pellets.
Structure of Mixing Building
Installation of Mixing Building structure has been started on 08/04/2014.
Start carrying structure of Mixing Building to the Site
Hall of incorporation of carrier structure on the site was started on 05/12/1392.