News category: ‘Hostels’
Ready to equip new workers' dormitories
Since the beginning of September, 93 new workers' hostel with capacity for 120 people and equipped to exploit the.
Installation of structures Camp Site 3
Installation of structure Camp site 3 has been started on 2014/05/06.
Start of installation structure campsite 2.
campsite 2 structure installed began on 2014/04/26.
Construction Of New Residences
Excavation of new residences started on 26/02/2014 , and on 11/03/2014 the first concrete foundation was began..