Skip to content
Counterweights, Stacker_____________________Burner display_____________________Electric Stacker_____________________Nsvzkary_____________________UPS boards

News category: ‘Equipment’

Install the slack between 4 and concentrated

Install the slack between 4 and concentrated on 1393/11/03 was.

Install the slack between 3 concentrates

Install the slack between 3 concentrates on 1393/11/02 was.

The second support installation of concentrate mixture Hall

Second support is the concentrate mixing Hall on 93/10/04 was installedDSCF4573

Installation of the first pelletizing equipment

Support the incorporation of the concentrate Hall on 93/09/24 The equipment was installed and launched Project.

DSCF4311