Begin of Indurating Building executive activities

According to reception of foundation plots of this building from Tehran office on 11/12/2013, the prerequisite activities carried out on the same date.. It is notabe that foundation excavation was already completed in Site Leveling procedure. From the mentioned date, the surveying tasks continued and each place that required excavation or embankment was corrected.

FC Drawings Announcement of the Indurating building foundation on 11/12/2013

The first part of Drawing of the Indurating building foundation based on transmittal number AZT/PRJ/P/T0060 , on 11/12/2013 was sent to site from Tehran office to initiate enforcement actions.

Indurating Building & FC Drawings

Prepared for FC Drawings of foundation to be sent from Tehran office.